Longgun Town Agrivoltaic Project with Supporting Energy Storage

Products

25MW/50MWh

The project adopts a liquid-cooled energy storage system, con-sisting of TrinaStorage Elementa King Kong 1 battery cabinequipped with Trina Energy Storage self-developed 280Ahcells and TrinaTec integrated inverter-booster cabin.

The project was completed and put into grid-connected opera-tion and delivery within 90 days.

Product Gallery

Get A Quote

Please provide detailed requirements information. The operations specialist will contact you within one working day.

TEL:+86 18806120030

Time:8:00 - 24:00